Furman University Pearce-Horton Football Complex

The Furman University Pearce-Horton Football Complex is a 4-level, 44,000 SF facility located adjacent to the existing stadium. It includes a locker room and player lounge/study area for the football team. In addition, the facility will house coaches offices, a team meeting room, position meeting rooms, a sports medicine area, equipment room and other support space. The building also includes a press level and a private suite/club level with outdoor viewing areas and catering amenities. The exterior design of traditional columns and pediment complement the existing campus architecture with a brick façade and contemporary glass features. The $8.8 million project underwent construction after the fall 2012 football season and was completed in time for the 2014 season.